Product Proposal and Development
Setup a project from food manufacturer
Project outline
Customer’s industry | Food manufacturer |
---|---|
Number of lots | 3 million sets |
Development period | 3 months |
Solution provided | Outsourcing of manufacturing |
Request background
A major NB manufacturer wanted to conduct a limited-time sales promotion campaign for their flagship product by attaching a mascot to it, but were having trouble finding a company that could handle the large quantity because the process would be manual.
UFI support details
By proposing to several setup plants through the UFI network, we were able to assemble processes, quality control, and equipment in a short period of time and deliver 3 million sets as requested on time.
Support results
The campaign was executed promptly, and the sales volume grew so well that the spot campaign schedule was confirmed to continue for the same period the following year.
Voice of person in charge
Even though setup was not our main business, we were able to expand sales of the product at the proposal of using a network of factories outside of its own.
We were able to rely on a company that strictly controls its plants, and we were also able to rely on a contractor to do the same, which gave us peace of mind in terms of quality.
In the future, we would like to consult again about any manufacturing problems we have.